Skip to main content
Cold aisle in the Zenix Istanbul data hall

Carrier-neutral · AS209604 · 99.99% SLA

Colocation for your own hardware

Cabinet space from a few units to a private cage in Istanbul, Sofia, Dublin and Karachi. Space, power and cross-connects are quoted for the site you choose. Authorised staff may enter 24/7; the entry method is listed on each location page.

Overview

Sites
Istanbul · Sofia · Dublin · Karachi
Network
AS209604 · on-site cross-connects
Power
A/B feeds, site-dependent
Access
Authorised staff, 24/7
SLA
99.99%
  • ISO 27001
  • PCI DSS
  • 99.99%SLA
  • AS209604BGP
  • Carrier-neutral

Space options

From 1–4U in a shared cabinet to a full cabinet or private cage. Power and ports are sized with the installation.

  1. Partial cabinet

    1–4U

    Space
    1–4U in a shared cabinet.
    Connectivity
    Port and IP addresses are defined on the order.
  2. Quarter cabinet

    ¼ cabinet

    Space
    A reserved section of one cabinet.
    Connectivity
    A dedicated port and cross-connect can be provided.
  3. Half cabinet

    ½ cabinet

    Space
    Half the cabinet height, one customer.
    Connectivity
    A/B power where the hall is dual-fed.
  4. Full cabinet

    1 cabinet

    Space
    A cabinet reserved for one customer.
    Connectivity
    Feeds and interconnects are planned for the site.
  5. Cage or suite

    Cage / suite

    Space
    A locked cage or segregated suite.
    Connectivity
    Private interconnects and dedicated power.

Pricing is prepared for the site, density and cross-connects you need. Cabinet diagrams are schematic.

Facility infrastructure

Power, cooling, network and access are published per site. Details are on the relevant location page.

Facility

  • Power

    A/B distribution where the hall supports it. UPS and generator topology (N+1 or 2N) is stated on the location page.

  • Cooling

    N+1 precision cooling at the published sites. If a PUE is published, it appears on that location page.

  • Connectivity

    Carrier-neutral floor. Cross-connect to the on-net operators at the site. The Zenix network runs on AS209604.

Operations

  • Physical access

    Authorised staff, 24 hours. Card, multi-factor authentication or escort — the method is listed on the location page.

  • Remote hands

    On-site engineers at each facility for racking, cabling and hands-on work. Scope and timing are defined on the order.

  • Compliance

    ISO 27001 and PCI DSS. Istanbul is also in scope for EN 50600 Class 3. Certificates are listed on the location pages.

Provisioning process

  1. 01

    Requirements

    Required power, U space and the operators needed at the site are defined.

  2. 02

    Site visit

    You may walk the hall with the facility team if you wish.

  3. 03

    Proposal

    Space, power and cross-connects are quoted in writing for the chosen site.

  4. 04

    Delivery

    Hardware is received at the facility and inspected.

  5. 05

    Installation

    Racking and cabling are completed; handover follows once power and ports are live.

Frequently asked questions

Space, access, power and cross-connects.

  • 01What is the minimum space?

    Placement starts at 1–4U in a shared cabinet. Quarter, half and full cabinets are available, as well as a locked cage or private suite.

  • 02Is 24/7 access available?

    Authorised staff may enter at any hour. The entry method — card, multi-factor authentication or escort — varies by site and is stated on the location page.

  • 03Which operators can I cross-connect to?

    Cross-connects are available to the on-net operators at the chosen site. The list is on the relevant location page. Where you take Zenix network service, traffic is carried on AS209604.

  • 04How is power determined?

    Power and density are set for the chosen site and installation. Dual feed is provided where the hall infrastructure supports it.

  • 05Is remote hands available?

    Yes. On-site engineers at each facility handle racking, cabling, restarts and similar work. Scope and response time are defined on the order.

  • 06How does installation proceed?

    Requirements are confirmed, an optional site visit is arranged and a written proposal is issued. An installation window is scheduled after the hardware arrives at the facility.

Schedule a site visit

Tell us the location, space and interconnects you need. The proposal is prepared for that facility.